ČESKÁ TECHNICKÁ NORMA
ICS 35.240.67, 91.010.01 Říjen 2019
Organizace a digitalizace informací o budovách
a inženýrských stavbách včetně informačního modelování staveb (BIM) –
Management informací s využitím informačního modelování staveb – |
ČSN 73 0150 |
idt ISO 19650-1:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling – Part 1: Concepts and principles
Organisation et numérisation des
informations relatives aux bâtiments et ouvrages de génie civil, y compris
modélisation
des informations de la construction (BIM) – Gestion de l’information par
la modélisation des informations de la construction – Partie 1:Concepts
et principes
Organisation von Daten zu Bauwerken – Informationsmanagement mit BIM – Teil 1: Konzepte und Grundsätze
Tato norma je českou verzí evropské normy
EN ISO 19650-1:2018. Překlad byl zajištěn Českou agenturou
pro standardizaci. Má stejný status jako oficiální verze.
This standard is the Czech version of the European Standard EN ISO 19650-1:2018. It was translated by the Czech Standardization Agency. It has the same status as the official version.
Nahrazení předchozích norem
Touto normou se nahrazuje ČSN EN ISO 19650-1 (73 0150) z června 2019.
Národní předmluva
Změny proti předchozí normě
Proti předchozí normě dochází ke
změně způsobu převzetí EN ISO 19650-1:2018 do soustavy norem ČSN.
Zatímco ČSN EN ISO 19650-1 (73 0150) z června 2019
převzala EN ISO 19650-1:2018 schválením k přímému používání jako
ČSN oznámením ve Věstníku ÚNMZ, tato norma ji přejímá překladem.
Souvisící ČSN
ČSN P ISO 6707-1 (73 0000) Pozemní a inženýrské stavby – Terminologie – Část 1: Obecné termíny
ČSN EN ISO 9001 (01 0321) Systémy managementu kvality – Požadavky
ČSN ISO 12006-2 (73 0101) Budovy a inženýrské stavby – Organizace informací o stavbách – Část 2: Rámec pro klasifikaci
ČSN EN ISO 12006-3 (73 0101) Budovy a inženýrské stavby – Organizace informací o stavbách – Část 3: Rámec pro objektově orientované informace
ČSN P ISO/TS 12911 (73 0121) Rámec pro návody na informační modelování staveb (BIM)
ČSN EN ISO 16739 (73 0100) Datový formát Industry Foundation Classes (IFC) pro sdílení dat ve stavebnictví a ve facility managementu
ČSN EN ISO 19650-2 (73 0150) Organizace a digitalizace informací o budovách a inženýrských stavbách včetně informačního modelování staveb (BIM) – Management informací s využitím informačního modelování staveb – Část 2: Dodací fáze aktiv
ČSN ISO 21500 (01 0345) Návod k managementu projektu
ČSN ISO 22263 (73 0102) Organizace informací o stavbách – Rámec pro správu informací o projektu
ČSN EN ISO/IEC 27000
(36 9790) Informační technologie – Bezpečnostní techniky –
Systémy řízení bezpeč-
nosti informací – Přehled a slovník
ČSN EN ISO 29481-1 (73 0122) Informační modely staveb – Manuál pro předávání informací – Část 1: Metodika a formát
ČSN ISO 31000 (01 0351) Management rizik – Směrnice
ČSN ISO 55000 (01 0375) Management aktiv – Přehled, zásady a terminologie
ČSN EN 82045-1 (01 3740) Správa dokumentů – Část 1: Zásady a metody (IEC 82045-1)
Upozornění na národní poznámky
Do normy byly k článkům 3.2.1, 3.3.1 a 6.3.4 doplněny národní poznámky.
Vysvětlivky k textu převzaté normy
Vzhledem k návaznosti na oblast managementu aktiv je pro anglický termín „asset“ v českém překladu v souladu s ČSN ISO 55000 používán český ekvivalent „aktivum“, pro anglický termín „built asset“ je používán český ekvivalent „vystavěné aktivum“ – u obou termínů se jedná o jiný způsob náhledu na předmět zájmu, kterým je v kontextu stavebnictví ve většině případů stavba (zejména v případě vystavěného aktiva).
V českém překladu jsou pro
anglické termíny „appointment“, „appointing party“ a „appointed
party“ zvoleny české ekvivalenty „pověření“,
„pověřující strana“ a „pověřená strana“, aby obdobně jako v anglickém
textu obecně pojmeno-
vávaly různorodá uspořádání mezi zpravidla smluvními stranami, kterým
odpovídají i specifičtější pojmenování.
Pro slovní spojení, která v angličtině obsahují slovo „stage“, byly v kontextu projektů voleny české ekvivalenty obsahující slovo „etapa“ kvůli možnému vymezení jejich obsahu dohodou mezi stranami. V případě, že se tak strany dohodnou, budou etapy odpovídat obecně vymezeným fázím (fáze jsou obecně vymezeny životním cyklem stavby, etapy konkrétním projektem a jeho milníky).
Vypracování normy
Zpracovatel: CAD-BIM s. r. o., IČO 04428803, Ing. Štěpánka Tomanová; spolupráce: Ing. Jan Kolomazník
Technická normalizační komise: TNK 152 Organizace informací o stavbách a informační modelování staveb (BIM)
Pracovník České agentury pro standardizaci: Ing. Jan Šuser
Česká
agentura pro standardizaci je státní příspěvková organizace zřízená Úřadem pro
technickou normalizaci, metrologii a státní zkušebnictví na základě
ustanovení § 5 odst. 2 zákona č. 22/1997 Sb., o technických
požadav-
cích na výrobky a o změně a doplnění některých zákonů, ve znění
pozdějších předpisů.
EVROPSKÁ NORMA EN ISO 19650-1
EUROPEAN STANDARD
NORME EUROPÉENNE
EUROPÄISCHE NORM Prosinec 2018
ICS 35.240.67; 91.010.01
Organizace a digitalizace informací o budovách
a inženýrských stavbách včetně informačního modelování staveb (BIM) –
Management informací s využitím informačního modelování staveb –
Část 1: Pojmy a principy
(ISO 19650-1:2018)
Organization and digitization of information
about buildings and civil engineering works, including building information
modelling (BIM) – Information management using building information
modelling –
Part 1: Concepts and principles
(ISO 19650-1:2018)
Organisation et numérisation
des informations relatives aux bâtiments et ouvrages de génie civil, y compris
modélisation des informations |
Organisation von Daten zu Bauwerken – Informationsmanagement
mit BIM – |
Tato evropská norma byla schválena CEN dne 2018-07-24.
Členové CEN jsou povinni splnit vnitřní předpisy
CEN/CENELEC, v nichž jsou stanoveny podmínky, za kterých se této evropské
normě bez jakýchkoliv modifikací uděluje status národní normy. Aktualizované
seznamy a biblio-
grafické citace týkající se těchto národních norem lze obdržet na vyžádání v Řídicím
centru CEN-CENELEC nebo u kteréhokoliv člena CEN.
Tato evropská norma existuje ve třech oficiálních verzích (anglické, francouzské, německé). Verze v každém jiném jazyce přeložená členem CEN do jeho vlastního jazyka, za kterou zodpovídá a kterou notifikuje Řídicímu centru CEN-CENELEC, má stejný status jako oficiální verze.
Členy CEN jsou národní normalizační orgány Belgie, Bulharska, Bývalé jugoslávské republiky Makedonie, České republiky, Dánska, Estonska, Finska, Francie, Chorvatska, Irska, Islandu, Itálie, Kypru, Litvy, Lotyšska, Lucemburska, Maďarska, Malty, Německa, Nizozemska, Norska, Polska, Portugalska, Rakouska, Rumunska, Řecka, Slovenska, Slovinska, Spojeného království, Srbska, Španělska, Švédska, Švýcarska a Turecka.
Evropský výbor pro normalizaci European Committee for Standardization Comité Européen de Normalisation Europäisches Komitee für Normung Řídicí centrum CEN-CENELEC: Rue de la Science 23, B-1040 Brusel © 2018 CEN Veškerá
práva pro využití v jakékoliv formě a jakýmikoliv prostředky Ref.
č. EN ISO 19650-1:2018 E |
Tento dokument (EN ISO 19650-1:2018) vypracovala technická komise ISO/TC 59 Budovy a inženýrské stavby, ve spolupráci s technickou komisí CEN/TC 442 Informační modelování staveb (BIM), jejíž sekretariát zajišťuje SN.
Této evropské normě je nutno nejpozději do června 2019
udělit status národní normy, a to buď vydáním identic-
kého textu, nebo schválením k přímému používání, a národní normy,
které jsou s ní v rozporu, je nutno zrušit nejpozději do června 2019.
Upozorňuje se na možnost, že některé prvky tohoto dokumentu mohou být předmětem patentových práv. CEN nelze činit odpovědným za identifikaci jakéhokoliv nebo všech patentových práv.
Podle vnitřních předpisů CEN/CENELEC jsou tuto evropskou normu povinny zavést národní normalizační organizace následujících zemí: Belgie, Bulharska, Bývalé jugoslávské republiky Makedonie, České republiky, Dánska, Estonska, Finska, Francie, Irska, Islandu, Itálie, Kypru, Litvy, Lotyšska, Lucemburska, Maďarska, Malty, Německa, Nizozemska, Norska, Polska, Portugalska, Rakouska, Rumunska, Řecka, Slovenska, Slovinska, Spojeného království, Srbska, Španělska, Švédska, Švýcarska a Turecka.
Oznámení o schválení
Text ISO 19650-1:2018 byl schválen CEN jako EN ISO 19650-1:2018 bez jakýchkoliv modifikací.
|
||
Strana |
|
Page |
Předmluva..................................................................................................................................................................................................... 7 Úvod................................................................................................................................................................................................................ 8 1......... Předmět normy.............................................................................................................................................................................. 10 2......... Citované dokumenty..................................................................................................................................................................... 10 3......... Termíny a definice........................................................................................................................................................................ 10 3.1...... Obecné termíny............................................................................................................................................................................. 10 3.2...... Termíny spojené s aktivy a projekty........................................................................................................................................... 11 3.3...... Termíny spojené s managementem informací....................................................................................................................... 13 4......... Informace o aktivu a projektové
informace, 4.1...... Zásady............................................................................................................................................................................................. 16 4.2...... Management informací podle souboru 4.3...... Různé pohledy na management informací............................................................................................................................. 18 5......... Stanovení požadavků na informace a výsledné informační modely.................................................................................. 20 5.1...... Principy............................................................................................................................................................................................ 20 5.2...... Požadavky organizace na informace (OIR)............................................................................................................................. 22 5.3...... Požadavky na informace o aktivu (AIR).................................................................................................................................... 23 5.4...... Požadavky na projektové informace (PIR)............................................................................................................................... 23 5.5...... Požadavky na výměnu informací (EIR)..................................................................................................................................... 23 5.6...... Informační model aktiva (AIM).................................................................................................................................................... 24 5.7...... Projektový informační model (PIM)........................................................................................................................................... 24 6......... Cyklus předávání informací........................................................................................................................................................ 24 6.1...... Principy............................................................................................................................................................................................ 24 6.2...... Překrývání s životním cyklem aktiva.......................................................................................................................................... 25 6.3...... Nastavování požadavků na informace a plán předávání informací................................................................................... 27 6.3.1... Obecné principy............................................................................................................................................................................. 27 6.3.2... Realizační tým dodává informace pro rozhodnutí vlastníka/provozovatele nebo objednatele..................................... 29 6.3.3... Ověřování a validace informací na
začátku 6.3.4... Informace pocházejí od celého realizačního týmu................................................................................................................. 32 6.3.5... Souhrn předaných informací od realizačních 7......... Funkce při managementu projektových informací a informací o aktivech........................................................................ 36 7.1...... Principy............................................................................................................................................................................................ 36 7.2...... Funkce při managementu informací o aktivech...................................................................................................................... 37 7.3...... Funkce při managementu projektových informací................................................................................................................. 38 7.4...... Funkce při managementu úkolových informací...................................................................................................................... 38 8......... Způsobilost a kapacita realizačního týmu................................................................................................................................ 38 8.1...... Principy............................................................................................................................................................................................ 38 Strana 8.2...... Rozsah přezkoumání způsobilosti a kapacity.......................................................................................................................... 39 9......... Společná práce založená na informačních kontejnerech..................................................................................................... 39 10....... Plánování předávání informací.................................................................................................................................................. 40 10.1.... Principy............................................................................................................................................................................................ 40 10.2.... Časové rozložení předávání informací..................................................................................................................................... 41 10.3.... Matice odpovědnosti..................................................................................................................................................................... 41 10.4.... Stanovení strategie sdružování a struktury
11....... Řízení společného vytváření informací 11.1.... Principy............................................................................................................................................................................................ 42 11.2.... Úroveň potřebnosti informací..................................................................................................................................................... 43 11.3.... Kvalita informací............................................................................................................................................................................ 44 12....... Řešení a postup prací pro společné
datové 12.1.... Principy............................................................................................................................................................................................ 44 12.2.... Stav rozpracováno........................................................................................................................................................................ 47 12.3.... Přechod kontrolou/přezkoumáním/schválením...................................................................................................................... 47 12.4.... Stav sdíleno.................................................................................................................................................................................... 47 12.5.... Přechod přezkoumáním/autorizováním................................................................................................................................... 47 12.6.... Stav publikováno........................................................................................................................................................................... 48 12.7.... Stav archivováno........................................................................................................................................................................... 48 13....... Shrnutí „informačního modelování staveb (BIM) podle souboru ISO 19650“................................................................... 48 Příloha A (informativní) Znázornění strategií sdružování a struktur členění informačních kontejnerů..................................... 52 Bibliografie.................................................................................................................................................................................................. 58
|
|
Foreword................................................................................................................................................................................................... 7 Introduction............................................................................................................................................................................................... 8 1......... Scope.......................................................................................................................................................................................... 10 2......... Normative references.............................................................................................................................................................. 10 3......... Terms and definitions.............................................................................................................................................................. 10 3.1...... General terms............................................................................................................................................................................ 10 3.2...... Terms related to assets and projects.................................................................................................................................... 11 3.3...... Terms related to information management........................................................................................................................ 13 4......... Asset
and project information, perspectives 4.1...... Principles.................................................................................................................................................................................... 16 4.2...... Information
management according 4.3...... Information management perspectives............................................................................................................................... 18 5......... Definition
of information requirements 5.1...... Principles.................................................................................................................................................................................... 20 5.2...... Organizational information requirements (OIR)................................................................................................................. 22 5.3...... Asset information requirements (AIR).................................................................................................................................. 23 5.4...... Project information requirements (PIR)................................................................................................................................ 23 5.5...... Exchange information requirements (EIR).......................................................................................................................... 23 5.6...... Asset information model (AIM).............................................................................................................................................. 24 5.7...... Project information model (PIM)............................................................................................................................................ 24 6......... The information delivery cycle............................................................................................................................................... 24 6.1...... Principles.................................................................................................................................................................................... 24 6.2...... Alignment with the asset life cycle........................................................................................................................................ 25 6.3...... Setting
information requirements and planning 6.3.1... General principles.................................................................................................................................................................... 27 6.3.2... Delivery team provides information for asset owner/operator or client decisions....................................................... 29 6.3.3... Information
verification and validation at start 6.3.4... Information is drawn from the whole delivery team.......................................................................................................... 32 6.3.5... Summary
of information delivery from project 7......... Project and asset information management functions..................................................................................................... 36 7.1...... Principles.................................................................................................................................................................................... 36 7.2...... Asset information management functions.......................................................................................................................... 37 7.3...... Project information management functions........................................................................................................................ 38 7.4...... Task information management functions............................................................................................................................ 38 8......... Delivery team capability and capacity.................................................................................................................................. 38 8.1...... Principles.................................................................................................................................................................................... 38 Page 8.2...... Extent of capability and capacity review.............................................................................................................................. 39 9......... Information
container-based collaborative 10....... Information delivery planning................................................................................................................................................ 40 10.1.... Principles.................................................................................................................................................................................... 40 10.2.... Timing of information delivery............................................................................................................................................... 41 10.3.... Responsibility matrix................................................................................................................................................................ 41 10.4.... Defining the federation strategy and breakdown structure for information containers.............................................. 41 11....... Managing
the collaborative production 11.1.... Principles.................................................................................................................................................................................... 42 11.2.... Level of information need....................................................................................................................................................... 43 11.3.... Information quality.................................................................................................................................................................... 44 12....... Common
data environment (CDE) solution 12.1.... Principles.................................................................................................................................................................................... 44 12.2.... The work in progress state...................................................................................................................................................... 47 12.3.... The check/review/approve transition.................................................................................................................................... 47 12.4.... The shared state....................................................................................................................................................................... 47 12.5.... The review/authorize transition.............................................................................................................................................. 47 12.6.... The published state.................................................................................................................................................................. 48 12.7.... The archive state....................................................................................................................................................................... 48 13....... Summary of “building information modelling (BIM) according to the ISO 19650 series”.......................................... 48 Annex A (informative) Illustrations of federation strategies and information container breakdown structures.................. 52 |
Předmluva |
|
Foreword |
ISO (Mezinárodní
organizace pro normalizaci) je celo- |
|
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. |
Postupy
použité při tvorbě tohoto dokumentu a postupy určené pro jeho další udržování jsou popsány
ve směrnicích ISO/IEC, část 1. Zejména se má věnovat pozornost rozdílným
schvalovacím kritériím potřebným pro různé druhy dokumentů ISO. Tento
dokument byl vypracován v souladu s redakčními pravidly uvede- |
|
The
procedures used to develop this document and those intended for its further maintenance are described in the
ISO/IEC Directives, Part 1. In particular, |
Upozorňuje se na možnost, že některé prvky tohoto dokumentu mohou být předmětem patentových práv. ISO nelze činit odpovědnou za identifikaci jakéhokoliv nebo všech patentových práv. Podrobnosti o jakýchkoliv patentových právech identifikovaných během přípravy tohoto dokumentu budou uvedeny v úvodu a/nebo v seznamu patentových prohlášení obdržených ISO (viz www.iso.org/patents). |
|
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of any patent rights identified during the development of the document will be in the Introduction and/or on the ISO list of patent declarations received (see www.iso.org/patents). |
Jakýkoliv obchodní název použitý v tomto dokumentu se uvádí jako informace pro usnadnění práce uživatelů a neznamená schválení. |
|
Any trade name used in this document is information given for the convenience of users and does not constitute an endorsement. |
Vysvětlení
nezávazného charakteru technických norem, významu specifických termínů a výrazů ISO, které se vztahují k posuzování
shody, jakož i informace o tom, jak ISO dodržuje principy Světové
obchodní organi- |
|
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions related to conformity assessment, as well as information about ISO’s adherence to the World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT) see www.iso.org/iso/foreword.html. |
Za tento dokument je odpovědná komise ISO/TC Budovy a inženýrské stavby, subkomise SC 13 Organizace a digitalizace informací o budovách a inženýrských stavbách včetně informačního modelování staveb (BIM). |
|
This document was prepared by Technical Committee ISO/TC 59, Buildings and civil engineering works, SC 13, Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM). |
Seznam všech částí souboru ISO 19650 lze nalézt na webových stránkách ISO. |
|
A list of all parts in the ISO 19650 series can be found on the ISO website. |
Zpětná vazba nebo připomínky k tomuto dokumentu se mají adresovat národnímu normalizačnímu orgánu uživatele. Úplný seznam těchto orgánů lze nalézt na www.iso.org/members.html. |
|
Any feedback or questions on this document should be directed to the user’s national standards body. A complete listing of these bodies can be found at www.iso.org/members.html. |
Úvod |
|
Introduction |
Tento
dokument vymezuje doporučené pojmy a principy pro obchodní procesy napříč odvětvím
vybudovaného prostředí k podpoře managementu a vytváření infor- |
|
This document sets out the recommended concepts and principles for business processes across the built environment sector in support of the management and production of information during the life cycle of built assets (referred to as “information management”) when using building information modelling (BIM). These processes can deliver beneficial business outcomes to asset owners/operators, clients, their supply chains and those involved in project funding including increase of opportunity, reduction of risk and reduction of cost through the production and use of asset and project information models. In this document, the verbal form “should” is used to indicate a recommendation. |
Tento dokument je primárně určen k užívání těmi, kdo se: |
|
This document is primarily intended for use by: |
– podílejí na zadávání, navrhování, výstavbě a/nebo předávání vystavěných aktiv do užívání; |
|
– those involved in the procurement, design, construction and/or commissioning of built assets; and |
– podílejí na realizaci aktivit managementu aktiv včetně provozování a udržování aktiv. |
|
– those involved in delivering asset management activities, including operations and maintenance. |
Tento dokument platí pro vystavěná aktiva a stavební projekty všech velikostí a na všech úrovních složitosti. To zahrnuje rozsáhlé nemovitosti, sítě fyzické infrastruktury, jednotlivé budovy a prvky fyzické infrastruktury a projekty nebo soubory projektů spojené s jejich přípravou a realizací. Pojmy a principy obsažené v tomto dokumentu ale mají být uplatňovány odpovídajícím a vhodným způsobem podle velikosti a složitosti řešeného aktiva nebo projektu. To se zejména týká případů, kdy jsou managementem aktiv nebo realizací projektů převážně pověřeny malé a střední podniky. Je rovněž důležité, aby zadávání a následná mobilizace stran pověřených pro určité aktivum nebo projekt byly co nejvíce integrovány s dosavadními procesy pro zadávání a mobilizaci. |
|
This document is applicable to built assets and construction projects of all sizes and all levels of complexity. This includes large estates, infrastructure networks, individual buildings and pieces of infrastructure and the projects or sets of projects that deliver them. However, the concepts and principles included in this document should be applied in a way that is proportionate and appropriate to the scale and complexity of the asset or project. This is particularly the case where small and medium-sized enterprises are mainly appointed for asset management or project delivery. It is also important that procurement and mobilization of asset or project appointed parties should be integrated as far as possible with existing processes for technical procurement and mobilization. |
Pojmy a principy
obsažené v tomto dokumentu jsou zaměřeny na všechny subjekty zapojené do
životního cyklu aktiv. Mezi takové subjekty mj. patří vlastníci/ |
|
The concepts and principles contained in this document are aimed at all those involved in the asset life cycle. This includes, but is not limited to, the asset owner/operator, the client, the asset manager, the design team, the construction team, an equipment manufacturer, a technical specialist, a regulatory authority, an investor, an insurer and an end-user. |
Specifické požadavky týkající se managementu informací v průběhu přípravy a realizace vystavěných aktiv jsou uvedeny v ISO 19650-2. Tyto požadavky jsou založeny na pojmech a principech obsažených v tomto dokumentu, ale tento dokument sám o sobě nezakládá povinnost používat ISO 19650-2 nebo jinou část souboru ISO 19650. |
|
The specific requirements for information management during the delivery of built assets are provided in ISO 19650-2. These are based on the concepts and principles within this document, but on its own this document includes no obligation to apply ISO 19650-2 or any other part of the ISO 19650 series to be published. |
Existuje mnoho různých
způsobů, jak mohou vlastníci/ |
|
There are many different ways that asset
owners/ |
Spolupráce mezi účastníky zapojenými do stavebních
projektů a do managementu aktiv je stěžejní pro efektivní přípravu,
realizaci a provoz aktiv. Organizace stále více pracují v nových
prostředích pro spolupráci k dosažení vyšších úrovní kvality a větší
míry opětovného používání existujících znalostí a zkuše- |
|
Collaboration between the participants involved in construction projects and in asset management is pivotal to the efficient delivery and operation of assets. Organizations are increasingly working in new collaborative environments to achieve higher levels of quality and greater re-use of existing knowledge and experience. A significant outcome of these collaborative environments is the potential to communicate, re-use and share information efficiently, and to reduce the risk of loss, contradiction or misinterpretation. |
Skutečně společná práce vyžaduje vzájemné porozu- |
|
True collaborative working requires mutual understanding and trust and a deeper level of standardized process than has typically been experienced, if the information is to be produced and made available in a consistent timely manner. Information requirements need to pass along supply chains to the point where information can be most efficiently produced, and information needs to be collated as it is passed back. At present, considerable resources are spent on making corrections to unstructured information or incorrect management of information by untrained personnel, on solving problems arising from uncoordinated efforts of delivery teams, and on solving problems related to information reuse and reproduction. These delays can be reduced if the concepts and principles within this document are adopted. |
Je doporučeno, aby vlastníci aktiv, veřejní zadavatelé a orgány
veřejné moci na národní úrovni shromaž- |
|
To improve future editions of the ISO 19650 series, national asset owners, public clients and authorities are recommended to gather information and experiences about its implementation and use. |
Z hlediska souboru ISO 19650 může být přínosný formální proces managementu aktiv např. podle řady norem ISO 55000. Z hlediska souboru ISO 19650 může být také přínosný systematický přístup ke kvalitě v rámci organizace, např. podle ISO 9001, ačkoliv certifikace podle ISO 9001 není požadavkem souboru ISO 19650. Další normy týkající se informačních struktur a metod realizace jsou uvedeny v bibliografii. |
|
The ISO 19650 series can benefit from a formal process for managing assets, for example as in the ISO 55000 series. The ISO 19650 series can also benefit from a systematic approach to quality within an organization, for example as in ISO 9001, although certification to ISO 9001 is not a requirement of the ISO 19650 series. Other standards that relate to information structures and delivery methods are also listed in the Bibliography. |
1 Předmět normy |
|
1 Scope |
Tento dokument uvádí pojmy a principy pro manage- |
|
This document outlines the concepts and principles for information management at a stage of maturity described as “building information modelling (BIM) according to the ISO 19650 series”. |
Tento dokument uvádí pro všechny aktéry doporučení pro systém správy informací včetně jejich vyměňování, zaznamenávání, spravování verzí a organizování. |
|
This document provides recommendations for a framework to manage information including exchanging, recording, versioning and organizing for all actors. |
Tento dokument platí pro celý životní cyklus jakéhokoliv vystavěného aktiva, včetně strategického plánování, výchozího návrhu, technické přípravy, investiční přípravy, zpracování dokumentace, výstavby, každodenního provozu, údržby, rekonstrukcí, oprav a konce životního cyklu. |
|
This document is applicable to the whole life cycle of any built asset, including strategic planning, initial design, engineering, development, documentation and construction, day-to-day operation, maintenance, refurbishment, repair and end-of-life. |
Tento dokument lze přizpůsobit aktivům a projektům jakékoliv velikosti a složitosti tak, aby nebránil flexibilitě a všestrannosti charakterizující široký rozsah možných strategií zadávání a aby byly zohledněny náklady na implementaci tohoto dokumentu. |
|
This document can be adapted to assets or projects of any scale and complexity, so as not to hamper the flexibility and versatility that characterize the large range of potential procurement strategies and so as to address the cost of implementing this document. |
Konec náhledu - text dále pokračuje v placené verzi ČSN.